Saturday, 27 July 2013

Progress Report

Just a quick update for all my followers.

A fair bit of progress with the electrics have been made. I now have finally decided where the fuse box will go (to the left of transfer box) and have made up a frame for it to sit in.

The wires running into the box have been passed through the glands from an IP65 junction box, I will need to drill some 22mms hole in the box to fit them into.

The tricky bit is ensuring that there is enough flex inside and out to enable removal and maintenance in the future without having too much flapping around.

Hopefully I can design something that is functional yet not too untidy.


No comments: